Most websites take between 2 and 16 weeks to build, depending on the type. A brochure site usually takes 2 to 4 weeks, a CMS marketing site 6 to 10 weeks, an e-commerce store 8 to 14 weeks, and a custom web app 12 weeks or more. These are typical ranges, not guarantees. Content and feedback speed usually set the real date.
| Website type | Typical total time | What mostly decides the date | Typical design phase |
|---|---|---|---|
| Brochure site (1 to 8 pages) | 2 to 4 weeks | Copy and photos arriving on time | About 1 week |
| CMS marketing site (10 to 40 pages) | 6 to 10 weeks | Page count, templates and approval rounds | 2 to 3 weeks |
| E-commerce store | 8 to 14 weeks | Product data, payments, shipping and tax rules | 2 to 4 weeks |
| Custom web app | 12 weeks or more | Feature scope, logins, integrations and testing | 3 to 5 weeks, then iterated per sprint |
| Redesign of an existing site | 6 to 14 weeks | Content audit, redirects and migration | 2 to 4 weeks |
A typical build takes 2 to 4 weeks for a brochure site, 6 to 10 weeks for a CMS marketing site, 8 to 14 weeks for an online store, and 12 weeks or more for a custom web app. The range widens with page count, integrations and approval rounds.
Those numbers describe the calendar, not the hours of coding. A developer might need only a few days of pure build time for a brochure site. The rest of the schedule is waiting: for copy, for decisions, for a payment provider to approve your account.
For a general sense of how the phases stack up, Forbes Advisor's breakdown of a typical website build lists planning at two to three weeks, content creation at four to six weeks, design at two to three weeks and testing at one to two weeks. Several of these phases overlap in a well-run project, which is why the total is shorter than the sum.
If your question is about price rather than time, our guide to what a website costs in the UK and Europe covers that side. Time and cost are linked, but the drivers are not identical.
A website build moves through six phases: discovery, design, build, content, testing and launch. Discovery takes about 1 to 2 weeks, design 1 to 4 weeks, build 2 to 8 weeks or more, testing 1 to 2 weeks, and launch a few days. Content runs alongside the others.
We run projects through four steps: Discovery and Planning, Design and Prototyping, Development and Testing, then Launch and Support. The six phases below fit inside those steps. Content is the one that sits across all of them.
This is where you settle goals, audience, page list, features and who approves what. It is the cheapest week of the project and the most expensive one to skip. A clear sitemap and a written list of must-have features stop most later arguments.
The output should be a scope document, a sitemap and a rough schedule. If your agency cannot show you these before design starts, ask for them.
Designers produce wireframes first, then visual mockups, then an interactive prototype for the key pages. Most of the elapsed time here is your feedback. As Wikipedia's overview of web development notes, the design phase is guided by the objectives set earlier, and good methodologies allow iteration as changes and additions appear.
Two review rounds is a sensible plan. A third round is common, and it is where schedules start to slip.
Developers turn approved designs into working pages, connect the CMS or back end, and add forms, analytics and integrations. We build with React, Next.js, Node.js and Supabase, which suits sites that need to scale. Simple sites on a template take days. Anything with logins, payments or custom logic takes weeks.
Copy, photography, product data, legal pages and translations all need writing or collecting. Start this on day one, not after design sign-off. A site built around placeholder text often needs layout fixes when real content arrives, because real headlines are longer and real photos are different shapes.
Testing covers devices and browsers, speed, forms, broken links, accessibility and security. For UK and EU audiences, accessibility is no longer optional for many commercial sites, so build it in early. Our note on the European Accessibility Act explains what that means in practice.
Launch includes DNS changes, SSL, redirects from old URLs, analytics checks and a final backup. A quiet weekday morning is better than a Friday afternoon. Support continues after this point with fixes, maintenance and small improvements.
Each type spends its time in different places. A brochure site is content-bound, a CMS site is template-bound, a store is integration-bound and a custom app is scope-bound. Knowing where your project spends its weeks tells you where to put your own effort.
A brochure site is a handful of pages that explain who you are and how to get in touch. A typical split is 3 to 4 days of discovery, about a week of design, 3 to 5 days of build, a few days of testing and a day or two for launch.
The only real risk is content. If the copy arrives after the build, a 2-week job turns into 5 weeks without anyone doing anything wrong.
A marketing site with a content management system has more pages, a blog or resources section, reusable page templates and editors who need training. Most of the extra time goes into page templates, content modelling and approval rounds.
Here is a hypothetical worked example. A Leeds landscaping company wants a 15-page site with a project gallery and a blog. A realistic plan looks like this:
That is 8 weeks if the owner supplies copy and photos by the end of week 4 and returns comments within two working days. If the photos arrive three weeks late, the same project lands at 11 weeks. The build team did the same work in both cases.
An online shop adds product pages, a basket and checkout, payment gateways, shipping rules, stock management and tax settings. Each one needs testing with real transactions. You also need returns and delivery policies written and live before you take the first order.
Product data is the hidden time sink. A catalogue of 200 products with sizes, images and descriptions can take longer to prepare than to build. Payment providers also run their own account checks, which can take days. For Nordic and EU stores, local payment methods add integration work, as we explain in our payment integration guide for Sweden.
A small store with a few dozen products and a standard theme can land near the low end of the range. A catalogue with variants, multiple currencies or ERP links sits at the top or beyond.
A custom web app has user accounts, dashboards, workflows and often integrations with CRMs, payment systems or other APIs. The schedule depends on how many features exist, how clearly each is defined, and how often requirements change. Design and build usually run in sprints rather than one straight line.
A rough rule is that every major integration adds one to three weeks, and every user role adds design and test time. If you are unsure whether you need an app at all, our web application vs website guide helps you decide first. A first version released to test an idea follows a different plan, which we cover in the MVP development timeline post.
The most common delay causes are late content, scope changes and slow feedback. Third-party approvals, such as payment accounts and domain access, come next. Most of these sit on the client side, which is good news, because you can control them.

Waiting for copy and images is the single most common reason a site misses its date. Writing is harder than most owners expect, and it competes with running the business. Agree a content deadline in week one, and treat it like a payment date.
Adding a members area, a second language or a booking form after design sign-off means redesign, new code and more testing. The change itself may look small. Its knock-on effects are not. Keep a parking list of "version two" ideas and protect the launch date.
Feedback that comes from one person within two working days keeps things moving. Feedback that comes from five people over two weeks, with conflicting opinions, does not. Name one decision maker and give them the final say.
Payment gateway approval, DNS access, CRM credentials and API keys all sit with other people. Request them in week one, not week six. Something as simple as not knowing who holds the domain login can stall a launch for days.
Accessibility, cookie consent and GDPR checks are cheaper at design stage than at the end. If they appear in the last week, expect a delay. Our website security checklist for European SMBs is a good pre-launch reference.
A remote team that overlaps with your working afternoons can answer questions and demo progress the same day, instead of the next. Our team is based in India and overlaps with CET afternoons, so UK and Northern European clients can review in the late afternoon and see fixes the next morning.

That rhythm helps most in the design and testing phases, where many small questions need quick answers. We respond to inquiries within 2 hours during business hours, so a blocker raised in the morning rarely waits until the next day.
There are limits. Overlap does not fix late content or slow sign-off on your side, and a 4.5 hour time difference to the UK still means some questions cross a night. If you want a deeper look at working across time zones, our guide to communication strategies for outsourced projects covers meeting rhythms and tools.
Keep a website project on schedule by fixing scope before design, starting content on day one, naming a single approver, and setting a feedback window of two working days. Review progress weekly against the agreed plan and move new ideas to a later release.
Use this checklist before kickoff:
When a check fails, act early. If content slips by a week, move the launch by a week rather than launching with placeholder text. If a payment provider is slow, test with sandbox mode and keep building. If scope grows, ask for a revised timeline in writing before work continues.
Something that is genuinely unsettled: faster is not always better. A 3-week build with no testing buffer can cost more in fixes than a 5-week build done carefully. We would rather quote a realistic range than a headline number that slips.
A simple brochure website of 1 to 8 pages usually takes 2 to 4 weeks from kickoff to launch. Most of that time is waiting for copy, photos and feedback. A template-based site with ready content can go live faster, but rushing testing often costs more later.
A CMS marketing site with 10 to 40 pages typically takes 6 to 10 weeks. Page templates, content loading, SEO setup and editor training make up most of the schedule. Fewer templates and faster approvals shorten it, while a blog migration or extra languages lengthen it.
An online store typically takes 8 to 14 weeks. Product data, payment setup, shipping and tax rules, and checkout testing take the time. A small catalogue on a standard theme sits at the low end, and custom features or ERP links push it higher.
The usual causes are late content, extra features added after sign-off, slow feedback and waiting on third parties. Ask your agency for a short written list of what is holding the date, and who owns each item. Most delays can be traced to a handful of open decisions.
A very small site on a template can be live in a week if every page of copy and every image is ready on day one. For a business site that needs custom design, testing and accessibility checks, a week is not realistic, and promises of it deserve scrutiny.
Cost generally rises with time, because more weeks mean more design, build and testing hours. The detail depends on scope, so read our breakdown of UK and European website costs or ask us for a scoped quote.
If you know your site type and have a rough page list, you can plan a believable timeline today. We build websites and web apps for startups and SMBs across the UK and Northern Europe, and we give honest ranges rather than optimistic ones. Explore our web development service, see how our UI/UX design work shortens the design phase, or check our app development service if you need a mobile companion to your site.